Supporting Concurrent Technologies’ Continued Growth
The Essex House installation demonstrates how a well-designed industrial workspace can combine technical performance, ergonomics and collaboration within one cohesive environment.
Rather than simply supplying standard ESD benches, Nortek Group worked closely with Concurrent Technologies to configure each workstation around the equipment, processes and working practices of the engineering team.
For businesses operating within electronics manufacturing, testing and development, controlling electrostatic discharge is critical. However, an effective ESD facility also needs to provide engineers with reliable power distribution, effective lighting, suitable storage and comfortable working positions.
By bringing these elements together, the Essex House project has created a professional testing environment designed around both the product and the people using it.
The completed facility also marks the continuation of a strong working relationship between Nortek Group and Concurrent Technologies as the business expands its UK operations.
“Thank you for being part of our expansion. Your support, guidance and install team have been incredible. Throughout the sales, delivery and installation process it has been a pleasure to work with you.”
Lisa Little – Global Health, Safety & Facilities Manager, Concurrent Technologies
If your business is experiencing a similar period of growth then get in touch with our design team today to explore how Nortek Group can help deliver world-class workspaces.